Engineers/Consultants/Commissioning
Design work on the nations largest geothermal campus began in February 2009 and soon, very soon, a large portion of the campus will go 'live.'
Read more »
Cost to repair the boiler = $5M. Cost to replace the boiler in just a few years after repairs wear out = almost $10M. When faced with this, MSU decided to take a look at other options.
Read more »
MEP Associates designed the geothermal loop field, mechanical/electrical systems to serve this facility. Power systems per Code, as well as low voltage systems including fire alarm, nurse call, paging and tele/data.
Read more »